On 7 October 2022, a ten-megawatt solar power plant, built near Paks with an investment of ten million euros, was inaugurated by Solar Rendszerépítő Kft.
In Tiszakécske, as a continuation of last year's 500 kWp system, our tasks in phase 2 were piling, structural construction and installation of the solar modules.